Build from series and parallel

Series / parallel connections

Nickel placement by bank and face

Blue links connect parallel cells. Gold links bridge consecutive series groups. Change the bank or flip the terminal face to inspect the other links.

Both faces use the same row and column coordinates. Blue shows parallel links and gold shows the outgoing series bridge on this face. Check separate leads for connections that change faces or banks.

Blue lines join like terminals in parallel. Gold joins this group’s positive terminal to the next group’s negative terminal. Numbers identify cells in the diagram and connection list.

Electrical connection plan. Check conductor sizing, insulation and physical paths with your pack builder.

Positive moves outward. Negative moves inward. Check the updated cell clearance after applying.

Start your build

Local preview on this Mac. EMG records the email you enter and your connection IP for internal use. Your design stays in this browser unless you export it. EMG does not sell personal data.

Report a bug

My builds

EMG Electric Moto Garage
motoPack

Build your electric dirt bike conversion.

Place a motor in your frame, draw the battery case, and fit cells for the voltage and capacity you want. Export the CAD layout for Kevin or your battery builder to review for a nearly plug-and-play kit.

Includes the KTM practice bike and QS138 motor models. Kevin has more motor files and frame models and is porting them into motoPack. In the CAD views, the swingarm pivot is the round bore behind the motor.
Finished electric build · concept render

From gas bike to electric build

Build it with Kevin

A one-on-one build consult is $50. The full $50 goes toward any product you purchase from Electric Moto Garage.

Contact Electric Moto Garage

Assembly viewer

Layers
Choose a frame or photo to start your assembly.
Camera & tools
Requested layout
Series target
Pack L × W × H, mm

Case dimensions

Case sides & flat SVG

Cell end view

Side profile editor

Click the rim to add a corner. Drag a dot to shape the angle. Double-click an interior dot to remove it. Near square or level, the point locks for one second. Hold Option/Alt to bypass.

Export

Squiggle exports work with the tight touching-cell layout. Full end plates need plastic between every round pocket, so those two buttons stay disabled until spacing is added.

BMS allowance

Electric Moto Garage

motoPack conversion wizard

What frame are you building on?

Choose one starting point. You’ll place the motor next.

Community frames
How to check photo accuracy

For a ⅛-inch fit target, check a second measured span against the scaled image to within ⅛ inch (3.2 mm). A single side photo cannot measure depth or correct perspective.

How to get a good frame photo

In your garage or at a dealership, bring a tape measure and use the 1× camera. Stand about 5–10 feet back and lower the lens to the middle of the battery and motor opening. Aim square to the side. Place a ruler in the same plane as the opening.

On eBay, search the model and year plus “bare frame.” Ask the seller for a full-resolution side photo and the center-to-center distance between two marked holes A and B. Ask for a second measurement to check scale, plus the narrowest usable width across the frame.

Custom layout object

Cardboard templates

Print at Actual size / 100%. Measure the 100 mm check line on a cutting sheet. Match the numbered neighbors and overlap their registration marks before tracing onto cardboard.

Electric Moto Garage

Enclosure sketch

Side sketch
Drawing layers

Before you continue

Finish the outline

Set the scale first

Choose points A and B on the image and enter their real distance in millimeters. Your outline stays in place.

Add part to frame layout